| October 25Yesterday was a productive day for me. In
the morning I put Jonah’s bicycle together. He was ecstatic and helped me with
tools and stuff. We had it together in about 30 minutes and he was off riding.
Kate bought him a new bike helmet, his old one was much too small for his big
head. She took him to town while I stayed behind to work on some projects. I
installed the 240v element in the hot water heater (we bought one in NZ last
year – we use the 120v element when we are cruising so we can make hot water
using out AC genset which of course is 120v, American style) so we can run the
hot water heater off shore power. It was relatively easy as I have done it twice
now. I also changed the filter cartridge for the
galley sink filter which has its own charcoal filter. We hadn’t changed it
since NZ last year and it was gross. We are supposed to do it every 6 months but
I just spaced it out. We got a call from the guy who pulled our generator the
other day. Its not repairable he says and further we cannot get one here in They gave me a good price as this is the
second one I have destroyed – both times through no fault of theirs. The first
one died on the way to the Marquesas last May. It overheated because the
external cooling in the genset enclosure stopped working. I had a replacement
shipped to Today’s schedule is light, we have to
scrub the dinghy (Zodiac) and stow it away in its bag. Right now it is lying on
deck strapped down partially inflated which is how we usually stow it when we
are moving from one anchorage to another. When we left Santo we had planned only
to go to My other project for today is to find
someone who can help me design and fabricate an anchor wash down hose holder. I
saw this on a boat recently and was blown away by it. It was just a stainless
bracket which holds a short length of hose over the anchor roller. The hose
connects to the deck fitting for the wash down pump (which is used to pump
seawater for washing the anchor chain and anchor when in muddy waters). The
bracket holds the hose right over the roller so as the chain comes up its gets a
good spritz. Everything else is all arranged. We have a
haul out scheduled for the 5th of November. While the boat is out of
the water we will do all the work on the shaft, stuffing box, shaft brake, etc.
as described in the previous journal I wrote (see October 23rd). We will also
paint the bottom using the super deadly, illegal toxic paint we bought in Our current paint was put on (as I said, in Other jobs on the list, which are of low to middle priority, include servicing the outboard (new fuel filter, spark plug, lower unit lube oil), repairing a bent stanchion, installing a new oil change pump (the old one died last month, I ordered one which should arrive soon), installing new house batteries which are also on order and should arrive soon (ours were AGM and they only lasted 3 years, we are going with Gel cells this time). We also have to end-for-end our anchor chain (the chain is High Tensile steel and is not meant to be regalvanized – I have been told the chain can lose up to 20% of its strength from regalvanizing). Then we have a few interior projects like repairing door hinges, the aft head door knob which broke, relocating the fans in the fwd cabin to a different location (which will not interfere with access to the chain locker as they do now). Sounds like a lot I know, but really these are all normal things that everyone out here has to deal with regularly. |