|
|
|
|
August 19This
morning we finally splashed the Queen Jane. At 7:40am we started to lift the
boat and then re-installed the centerboard. By 8:45 we were in the water.
There was a brief Chinese fire drill as we ran the engine dry of fuel almost
immediately just after clearing the slipway. The skipper had inadvertently
left the fuel selection manifold switched to an empty tank. Kate dropped the
hook immediately and we hauled up in Smith Creek just yards from a sailboat
docked at the Cairns Cruising Yacht Squadron next door to Norship, the boat
yard. We selected a proper tank with fuel and kate ran the started while the
skipper opened the injectors to bleed the air from the system and we had the
engine running within 2 minutes. By
11:40am we were docked at the marina with no further trouble. |