Photo Gallery - April 2002
Pictures can be clicked to see a large
version of the image.
The
Queen Jane's new bow pulpit being assembled. Although we had the plans from Shannon for the original pulpit, rather then take a chance of getting it wrong, the welder pre-cut the sections based on the plans then tack welded them together in-situ to ensure a proper fit.
The
entire piece was then brought back to the welder's shop where finish welding and
polishing was completed, then we bolted it to the boat.
Going
away part for "Skive". Standing is Ian, skipper. His wife Erika is
seated to his left. SKIVE is on the fast track back to England and will head for
Australia via Fiji and then North through Indonesia, Malaysia and Thailand
before heading across the Indian Ocean for the Red Sea in January.
Jonah
aloft in the bosuns chair. Although he loved it, his mother was not fond of
watching him in the chair.
One
more of Jonah in aloft. The skipper is working the halyard with the anchor
windlass foot pedals.
Jonah
and Hannah (from SKIVE).
After
4 months of work to restore the Queen Jane, the last thing to install was the
roller furler. Here the skipper and Mike McCormick are rigging the forestay with
roller furler.
The
Queen Jane at rest with the forestay. Now all we need is the genoa and we are
ready to go - Fiji here we come!